Работа lankho power plant Узбекистан, 342 актуальных вакансий

  • Chemistry Technician

    ENERSOK Узбекистан, Бекабад 15 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Lead Chemist

    ENERSOK Узбекистан, Бекабад 15 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Shieft Charge Engineer (SCE)

    ENERSOK Узбекистан, Бекабад 22 часа назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity of 1,600 ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Control Room Operator (CRO)

    ENERSOK Узбекистан, Бекабад 16 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Field Technician

    ENERSOK Узбекистан, Бекабад 15 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Lead Electrical/I&C Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 16 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity of 1,600 ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Lead Mechanical Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 16 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity of 1,600 ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • I&C Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 14 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Electrical Technician for Maintenance

    ENERSOK Узбекистан, Бекабад 14 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Mechanical Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 14 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • DCS (Distributed control systems) Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 14 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Electrical Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 14 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • I&C Technician for Maintenance

    ENERSOK Узбекистан, Бекабад 14 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Mechanical Technician for Maintenance

    ENERSOK Узбекистан, Бекабад 14 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a manner ... Contractor, to ensure that the Power Plant is safely and stably operated ...
    bekabad.hh.uz
  • Plant Manager, Fergana

    ИП ООО AIR PRODUCTS CENTRAL ASIA GROUP Узбекистан, Фергана 5 дней назад
    ... liquefier plants.As our Plant Manager for HPU and PSA, ... and supervise activities within plant boundaries and ensure all units ... the running of the plant. Develop and implement AP management ... in English.As the Plant Manager, you already are or ...
    fergana.hh.uz
  • Mechanical Engineer

    от 20000000 до 22000000 UZS
    SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO., LTD Узбекистан, Термез 6 дней назад
    ... None but PMP certificate precedence1.Power plant mechanical construction management skill or ... software More than 3 years power plant mechanical construction experience or similar ... of all utility, process and power piping construction management.4.Performing ...
    termez.hh.uz
  • Control Room Operator

    NOMAC SIRDARYA OPERATION AND MAINTENANCE SERVICES LLC Узбекистан, Ширин 2 дня назад
    ... the Combined Cycle Power Plant from the operator stations in the central control room. The objective is to ensure the plant operates reliably, safely, and efficiently ... experience in plant operations at Combined Cycle Thermal Power Plants. At least 4 years ...
    chirchiq.hh.uz
  • Procurement Specialist, Fergana

    ИП ООО AIR PRODUCTS CENTRAL ASIA GROUP Узбекистан, Фергана 24 дня назад
    ... . Liaise with shipping agents and plant personnel to ensure smooth import ... replenishment Material Control Assist with plant inventory spreadsheets to ensure accurate ...
    fergana.hh.uz
  • Senior BI Developer

    ShiwaForce.com PLC. Узбекистан, Ташкент 2 дня назад
    ... will have extensive experience with Power BI for data visualization and ... intelligence development. Proven expertise in Power BI — including data modeling, report ... to business users on using Power BI effectively. Location: Hybrid (Tashkent). ...
    tashkent.hh.uz
  • Electrical Engineer (Chirchiq, Adolat)

    ООО ENERGY CHINA KASHKADARIA SOLAR POWER Узбекистан, Ташкент, улица Мирзо Улугбека, 56А 3 дня назад
    ... . -Having experience working with Solar power, BESS, WIND power priority for joining. Terms: -official ...
    tashkent.hh.uz