Работа power supply Узбекистан, 361 актуальных вакансий

  • Account Supply Manager

    FE LLC Huawei Tech Investment Tashkent Узбекистан, Ташкент 3 дня назад
    ... in-depth insights into customer supply requirements and develop tailored supply strategies to ensure high satisfaction. ... , track goods arrival, and align supply with project requirements. Supply Chain Monitoring: Handle exceptions during ...
    tashkent.hh.uz
  • Supply Planning Specialist, Navoiy

    ИП ООО AIR PRODUCTS CENTRAL ASIA GROUP Узбекистан, Ташкент 18 дней назад
    ... , equipment) to meet this demand. Supply planning with particular attention to ... performance of daily duties. As Supply Planning Specialist you will: Meet ... at Air Products. As the Supply Planning Specialist, you already are ...
    tashkent.hh.uz
  • Supply Planning Specialist, Navoiy

    ИП ООО AIR PRODUCTS CENTRAL ASIA GROUP Узбекистан, Навои 18 дней назад
    ... , equipment) to meet this demand. Supply planning with particular attention to ... performance of daily duties. As Supply Planning Specialist you will: Meet ... at Air Products. As the Supply Planning Specialist, you already are ...
    navoi.hh.uz
  • Lead Chemist

    ENERSOK Узбекистан, Бекабад 9 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... all control and analysis of power station chemistry in a timely ...
    bekabad.hh.uz
  • Chemistry Technician

    ENERSOK Узбекистан, Бекабад 9 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... all control and analysis of power station chemistry in a timely ... Contractor, to ensure that the Power Plant is safely and stably ...
    bekabad.hh.uz
  • Senior Fire Fighting & Water Supply and Sewage Engineer

    Juru Узбекистан, Ташкент, Чуст улица, 10A 21 день назад
    ... proactive Senior Fire Fighting & Water Supply and Sewage (WSS) Engineer to ... in designing and engineering water supply, sewerage and firefighting systems; Experience ... calculations and analyses for water supply, sewerage, and firefighting systems. System ...
    tashkent.hh.uz
  • Shieft Charge Engineer (SCE)

    ENERSOK Узбекистан, Бекабад 11 часов назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity of 1,600 ... and operation phase of the Power Plant are managed in a ... Contractor, to ensure that the Power Plant is safely and stably ...
    bekabad.hh.uz
  • Control Room Operator (CRO)

    ENERSOK Узбекистан, Бекабад 9 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... Contractor, to ensure that the Power Plant is safely and stably ...
    bekabad.hh.uz
  • Lead Electrical/I&C Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 9 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity of 1,600 ... and operation phase of the Power Plant are managed in a ... Proven ability to minimize thermal power plants maintenance costs through effective ...
    bekabad.hh.uz
  • Lead Mechanical Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 9 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity of 1,600 ... and operation phase of the Power Plant are managed in a ... Proven ability to minimize thermal power plants maintenance costs through effective ...
    bekabad.hh.uz
  • Field Technician

    ENERSOK Узбекистан, Бекабад 9 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... Contractor, to ensure that the Power Plant is safely and stably ...
    bekabad.hh.uz
  • DCS (Distributed control systems) Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 8 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... Contractor, to ensure that the Power Plant is safely and stably ...
    bekabad.hh.uz
  • I&C Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 8 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... Contractor, to ensure that the Power Plant is safely and stably ...
    bekabad.hh.uz
  • Mechanical Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 8 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... Proven ability to minimize thermal power plants maintenance costs through effective ...
    bekabad.hh.uz
  • I&C Technician for Maintenance

    ENERSOK Узбекистан, Бекабад 8 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... Contractor, to ensure that the Power Plant is safely and stably ...
    bekabad.hh.uz
  • Electrical Technician for Maintenance

    ENERSOK Узбекистан, Бекабад 8 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... Proven ability to minimize thermal power plants maintenance costs through effective ...
    bekabad.hh.uz
  • Mechanical Technician for Maintenance

    ENERSOK Узбекистан, Бекабад 8 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... Proven ability to minimize thermal power plants maintenance costs through effective ...
    bekabad.hh.uz
  • Electrical Engineer for Maintenance

    ENERSOK Узбекистан, Бекабад 8 дней назад
    ... ), a new gas fired Independent Power Plant (IPP) with a power generation capacity close to 1, ... and operation phase of the Power Plant are managed in a ... Contractor, to ensure that the Power Plant is safely and stably ...
    bekabad.hh.uz
  • Mechanical Engineer

    от 16000000 до 20000000 UZS
    SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO., LTD Узбекистан, Термез 11 дней назад
    SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO., ... certificate precedence1.Power plant mechanical construction management skill ... 3 years power plant mechanical construction experience or ... utility, process and power piping construction management.4.Performing ...
    termez.hh.uz
  • Data Analyst (Supply Chain)

    Korzinka (Anglesey food) Узбекистан, Ташкент 17 дней назад
    ... мы в поисках Data Analyst (Supply Chain). Одна из ключевых задач ...
    tashkent.hh.uz